Queen Victoria Hospital Surgical Unit

You are here: Home - - Queen Victoria Hospital Surgical Unit

Project Description

The Queen Victoria Hospital Phase One contract involved the development of six new operating theatres and associated recovery areas at the specialist surgical hospital. This is a single storey building with a large plant room located on top of a composite roof deck. The O’Dwyer Steel Team was responsible for the structural steel detailing and steel fabrication on this contract with the aim to maintain a high standard of workmanship to increase erection speed and reduce cost.

Location:
East Grinstead, London.

Project Size:
57.275 Tonnes of Pre-Fabricated steel structure.

Floor Area:
3290 sqm.

Project Duration:
16-weeks

Features:
The O’Dwyer Steel Structural Engineer was involved in the structural design of the unique plant room roof truss structure.

Construction:
Involved a combination of Universal Beam & Column design at ground floor level with angle iron trusses at roof level.

Project Details
Skills:
Back to top