O’Dwyer’s reputation for high quality was key in securing the Hot Rolled steel contract for the St Anne’s project. These residential and commercial properties are part of the £70 million regeneration of St. Anne’s Quarter in the heart of Norwich. O’Dwyer Steel were provided with a pre-construction package from which a detailed set of fabrication drawings and site installation drawings were produced. Building Information Modelling was used throughout the design process. M&E service openings were incorporated through the HRS on all floors.
Location: St Anne’s Quarter, Norwich
Project Size: 260 tonnes