St Annes Quarter UK

O’Dwyer’s reputation for high quality was key in securing the Hot Rolled steel contract for the St Anne’s project. These residential and commercial properties are part of the £70 million regeneration of St. Anne’s Quarter in the heart of Norwich. O’Dwyer Steel were provided with a pre-construction package from which a detailed set of fabrication drawings and site installation drawings were produced. Building Information Modelling was used throughout the design process. M&E service openings were incorporated through the HRS on all floors.

Location: St Anne’s Quarter, Norwich

Project Size: 260 tonnes